2017 New Year’s Day on the Bund Xintiandi and other regional implementation of traffic control

In order to ensure the safe and orderly road traffic in Shanghai during the New Year’s Day in 2017, to avoid large-scale traffic congestion, to maintain good social order and public safety, according to the “People’s Republic of China People’s Police Law” “People’s Republic of China Road Traffic Safety Law” Shanghai Municipal Public Security Bureau, the Shanghai Municipal Public Security Bureau decided to December 30, 2016 to January 1, 2017 on the Shanghai part of the region, the road to take temporary traffic control measures. The following are hereby notified:

First, vehicle traffic control measures

(A) the Bund area

From 19:00 on December 31, 2016 to January 1, 2017 at 1:00, from the outside the White Bridge / North Suzhou Road junction, along the North Suzhou Road – Tibet North Road – Beijing West Road – Chengdu North Road – Yan’an Road – Tibet South Road – Fuxing East Road – outside the road to the edge of the composition of the scope of the Huangpu River (excluding the above road), prohibit all vehicular traffic. Yan’an Elevated Road on the south side of Jiangxi Road ramp on the implementation of temporary closure measures (only allow vehicles from the Bund tunnel).

(2) Xintiandi area

1. December 30, 2016 0:00 to January 1, 2017 at 1 pm, Hubin Road (Huangpi South Road – Jinan Road), Shunchang Road (Zonta Road – Lake Road) to prohibit all vehicular traffic.

2. From 20:00 on December 31, 2016 to 1:00 on January 1, 2017, from the Huaihai Zhong Road / freshwater road junction, along the freshwater road – Fuxing Road – Tibet South Road – Huaihai Road to Huaihai Road / freshwater road junctions (Not including the road), to prohibit all vehicular traffic.

Measures for the Control of Metro, Ferry and Sightseeing Tunnels

20 December 31, 20:00 to January 1, 2017 1:00, the implementation of the following measures:

(A) Metro Line 2, Line 10 Nanjing East Road Station entrances and exits; Rail Transit Line 10, Line 13 Xintiandi Station No. 1 entrance closed.

(2) Huangpu Jiangdong East Line ferry suspension.

(3) The Huangpu River sightseeing tunnel is closed.

Third, the traffic control, the implementation of the mandate of the police cars, fire engines, ambulances, rescue vehicles and other vehicles allowed to enter the scope of traffic control. At the same time, the traffic control within the bus lines will be adjusted accordingly.

How to fix DLL errors

  1. Launch the program DLL Suite and click on menu Overview, and scan your computer.
  2. Repair all detected DLL problems when the scan is complete.

How to download DLL files for free

  1. Run the program DLL Suite and click on menu DLL Download, and search the DLL file.
  2. Download the DLL file for free from the search results.

DLL Suite download link: http://www.vsksoft.com/dllsuite/download/